Wike dissatisfied with Mabushi Bus Terminal finishing touches

The FCT Minister, Nyesom Wike, has expressed dissatisfaction with the finishing touches of the Bus and Taxi Terminal project at Mabushi, Abuja. Wike expressed his dissatisfaction in Abuja on Tuesday, after he had inspected the terminal, which was at 90 per cent completion. The minister visited the site after inspecting the ongoing construction of the […]

Wike dissatisfied with Mabushi Bus Terminal finishing touches

Wike

The FCT Minister, Nyesom Wike, has expressed dissatisfaction with the finishing touches of the Bus and Taxi Terminal project at Mabushi, Abuja.

Wike expressed his dissatisfaction in Abuja on Tuesday, after he had inspected the terminal, which was at 90 per cent completion.

The minister visited the site after inspecting the ongoing construction of the Apo to Wasa left wing service lane, on the Outer Southern Expressway, and the Inter-change to link Wole Soyinka Way with Murtala Mohammed Way.

Wike also inspected the construction of the interchange at Shehu Yar’Adua Way to link Wole Soyinka Way to Utako and Jabi districts.

The minister expressed confidence that the Apo-Wasa Road would be ready for inauguration by President Bola Tinubu in May, along with the interchanges.

He, however, expressed displeasure with the finishing touches of the Mabushi bus terminal project, also expected to be inaugurated in May to celebrate Tinubu’s second year in office. (NAN)